ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2012, Vol. 32 ›› Issue (增刊1): 95-98.DOI: 10.3973/j.issn. 1672-741X.2012.z1.020
Previous Articles Next Articles
ZHANG Jun
Received:
Revised:
Online:
Published:
Abstract:
The construction difficulties of connection galleries and waste water pump room are presented, with the construction of connection galleries of shieldbored tunnel on Yitian stationShixia station section of 3151 bid section of Shenzhen Metro as an example. Jet grouting reinforcement technology is replaced by fullface grouting reinforcement technology. The construction technology and technical key points of fullface grouting reinforcement technology are presented. The successful construction of connection galleries of shieldbored tunnel under bad geological conditions is guaranteed after construction program optimization.
Key words: tunnel, connection gallery, shieldbored tunnel section, grouting, support, secondary lining
ZHANG Jun. Construction Technologies for Connection Galleries of Shieldbored Tunnels under Bad Geological Conditions[J]. Tunnel Construction, 2012, 32(增刊1): 95-98.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn. 1672-741X.2012.z1.020
http://www.suidaojs.com/EN/Y2012/V32/I增刊1/95
Key Technologies of Cutterhead Configuration and Cutter Replacement for Large diameter Shield under High Water Pressure
Experimental Effect Prediction of Ground Conditioning of Water rich Sandy Stratum Based on BP Neural Network
Fullscale Experimental Study on Bending Performance of Segmental Joints of Large Crosssection Shield Tunnel under Pure Compressive Bending Condition
Study on Optimization of Emergency Rescue Station of Yuntunbao Tunnel on ChengduLanzhou Railway
Launching and Receiving Technology of Large Crosssection Horseshoeshaped Shield Used in Baicheng Tunnel
Design and Analysis of a New TBM Propulsion System with Small Turning Radius
Study on Key Technologies and Application of Engineering Big Data Management Platform of Tunnel Boring Machine
Improvement Technology of Bearing Capacity of Prestressed Anchor Cable in Large span Tunnel: a Case Study on Badaling Great Wall Station